Welcome 
to Orb Designs

Home

Graffiti

FavTools

ShortList

About

Sitemap

Visual

DevWork


Email Brian Bilbrey

Email Brian

GPG Key

GRAFFITI -- May 10, 2010 thru May 16, 2010

>> Link to the Current Week <<

Last Week << Mon   Tues   Wed   Thu   Fri   Sat   Sun >> Next Week


Search this site :

Welcome to Orb Graffiti, a place for me to write daily about life and computers. Contrary to popular belief, the two are not interchangeable.     About eMail - I publish email sometimes. If you send me an email and you want privacy or anonymity, please say so clearly at the beginning of your message.



Creative Commons License

Read LinuxGazette, get a clue.

MONDAY    Tues    Wed    Thu    Fri    Sat    Sun   
May 10, 2010

Too busy.

Top  /  Email Brian


Mon    TUESDAY    Wed    Thu    Fri    Sat    Sun   
May 11, 2010

Still too busy..

Top  /  Email Brian


Mon    Tues    WEDNESDAY    Thu    Fri    Sat    Sun   
May 12, 2010

2107 - How do I describe 52 or so hours of DIY labor over the last five days? Hmmm.

Saturday, prep and painting. Monday, felt prep + flooring.
Tuesday, more flooring. Wednesday, shoe molding.

Saturday was painting day. The Behr paint (light blue) coated the guest room walls in one pass. The Glidden (something like a sage green) required two coats, but dried faster. About the same amount of paint used. So, points to Behr for less work needed. I need to remember that.

Sunday I went shopping in the morning, then went back through both rooms and cut in and/or rolled out all the bare-ish patches. Then it was time to clean up from painting and setup for flooring. However, since I had been working for about 14 hours on Saturday, I bailed out early, and didn't get fully rolling on the flooring prep until Monday morning.

Monday the flooring effort begins. Heavy roofing felt stapled down through both rooms. But I didn't have enough, so it was time to head to Home Depot and pick up another roll of that, along with renting the pneumatic nailer for the flooring. By the time I was actually ready to start flooring, it was past 1300. Sigh. I ran out of steam at 2000, after a 12 hour day. Only one room mostly floored - the closet remained to be laid.

Tuesday was flooring day two. Oh, yeah... the flooring is bamboo, "Toast" colored (heating caramelizes something in the stalks, IIRC) purchased from Home Depot online, and 16 boxes delivered a long time ago by UPS. So I finished up the closet in the front room, and then started laying the guest room floor. That finished up at around 2000 again last night, so the four day total hours stood at 44.

Today, I returned the flooring nailer, picked up shoe molding, cleaned up enough to work with that, and got all of that installed. I re-hung the doors, and cleaned up quite a bit of stuff, and managed to wrap up in 10 hours. Whew.

Now, instead of insurmountable, there's merely a punch list of items that can be done on one hard day, or two easy ones. I think I'll opt for the latter. More pix when everything's done. Ciao!

Top  /  Email Brian


Mon    Tues    Wed    THURSDAY    Fri    Sat    Sun   
May 13, 2010

2208 - Almost done. Floors, walls, and windows cleaned. Closet systems installed. Most of the big furniture is in place. New floor registers in place. Doors tuned so that they close again (paint changes things). The latter required both door trimming (yay for the new power planer) and hinge pocket adjustments (yay for sharp hand chisels). The mattress and the dresser have to make the trip, need to figure out lighting, and a couple of side tables, and perhaps a chair and an occasional table. I'm going to leave the plumbing for another time, in the not too distant future. Tired now, ciao!

Top  /  Email Brian


Mon    Tues    Wed    Thu    FRIDAY    Sat    Sun   
May 14, 2010

No Post.....

Top  /  Email Brian


Mon    Tues    Wed    Thu    Fri    SATURDAY    Sun   
May 15, 2010

0839 - The remodel is effectively done. Stuff needs to go back in the closets, art on the walls, etc. What I want to do today, after 7 long days working on that, and especially after the mutts allowed me a less-than-generous six hours of sleep last night, is to alternate between resting and sleeping for the entire day. What I'm going to do is yardwork, though. I'd best get to it before my determination fades. L8R.

Top  /  Email Brian


Mon    Tues    Wed    Thu    Fri    Sat    SUNDAY  
May 16, 2010

2035 - Yesterday, all the lawns appropriately edged, trimmed, and mowed. I also turned two of the garden beds. Oh, I also roasted the last of the older coffee. With luck, the latest order from Sweet Maria's awaits me at work, tomorrow. Today, shopping and some house cleaning. Tired and ready to get back to work.


Our condolences to the families and units of the fallen:

Top  /  Email Brian


Last Week << Mon   Tues   Wed   Thu   Fri   Sat   Sun >> Next Week


Visit the rest of the DAYNOTES GANG, a collection of bright minds and sharp wits. Really, I don't know why they tolerate me <grin>. My personal inspiration for these pages is Dr. Jerry Pournelle. I am also indebted to Bob Thompson and Tom Syroid for their patience, guidance and feedback. Of course, I am sustained by and beholden to my lovely wife, Marcia. You can find her online too, at http://www.dutchgirl.net/. Thanks for dropping by.

All Content Copyright © 1999-2011 Brian P. Bilbrey.

Creative Commons License
Except where otherwise noted, this site is licensed under the
Creative Commons Attribution-Noncommercial-Share Alike 3.0 United States License.